ball valves, gate valves, globe valves, check valves, Butterfly valves

News

Adjustment Of Relief Valve Discharge And Reseating Pressure

Relief valve adjustment valve discharge pressure and return pressure must reach the valve opening height test, therefore, only after large capacity test equipment or relief valve is installed on protected equipment may only be carried out. The adjustment method is different from the valve.


The valve disc holder and valve seat adjustment ring with structure, and the second is to adjust and adjust to the valve seat ring. Unscrew the adjusting ring screw from the exposed screw and come out like a thin stick tool, you can drag the adjusting ring gear teeth, the adjusting ring turns left or right. When the adjustment ring is rotated counterclockwise to the left, its lofty position will reduce stress and return stress. Conversely, when the adjusting ring is turned clockwise to the right, the lower exhaust pressure and back pressure must be increased. Every adjustment, adjustment: the rotation range should not be too large (generally rotate a few teeth).

safety valve

After each adjustment screw should be screwed on, so, adjusting the two teeth between the ring grooves can prevent the adjustment of the end of the ring without adjusting the radial pressure of the ring. For safety reasons, before touching the adjustment ring, the inlet pressure of the safety valve should be appropriately reduced (generally lower than 90% of the opening pressure) to prevent accidents before the adjustment valve suddenly opens.

For the structure of the upper and lower adjustment rings (the guide sleeve and seat have an adjustable ring), the adjustment is more complicated. Sit into the disc channel with the size of the adjusting ring and change the size of the adjusting ring when the valve disc degree of opening initial pressure accumulates in the chamber with the size of the adjusting ring. When the elevated seat adjusts the ring, the pressure build-up level increases, lowering the proportional valve opening phase, which quickly reaches a sudden sharp opening. Therefore, the added seat adjustment ring can lower the discharge